Tuesday, March 5, 2013

New drainage added to #6 apron

Today some much needed drainage and irrigation was added to #6 apron. There has never been  drainage or irrigation on the apron, so during the pond construction it was decided that both needed to be done. This area mainly needed drainage, because it played so wet most of the year and was unfair to the golfer. However it also would dry out and look unsightly during times of drought, so irrigation was added to allow for healthier turf to be grown. With these two additions to the apron it will allow this area to play like it was meant to be played.

No comments:

Post a Comment